Steingríms Power Station

1959Hydropower

Steingríms Power Station was commissioned on 6 August 1959. It is located on the Sog River, at the outlet of Lake Úlfljótsvatn.

Power from the Sog River

Steingríms Power Station is the third power station built on the Sog River. It harnesses the head between Lake Þingvallavatn and Lake Úlfljótsvatn, where water is conveyed through a tunnel in Dráttarhlíð to the powerhouse. The average outflow from Lake Þingvallavatn is approximately 100 m³/s.

The station was commissioned in 1959 and has an installed capacity of 26 MW.

The Power Station is named after Steingrímur Jónsson (1879-1952), engineer and director of the State Electricity Authority. He played a key role in the development of Iceland’s electricity system during the first half of the 20th century and was among the leading figures in the utilisation of the Sog River for electricity generation.

Key numbers

  • Installed capacity

    0MW
  • Kaplan turbines

    2×0MW
  • Generation capacity

    0GWh /y
  • Head

    0m
  • Maximum flow

    0m3/sec

A challenging start

Water rushing through the tunnel entrance after a temporary cofferdam failed at Lake Þingvallavatn during the construction of Steingríms Power Station.
Water rushing through the tunnel entrance after a temporary cofferdam failed at Lake Þingvallavatn during the construction of Steingríms Power Station.

Construction of Steingríms Power Station faced a major setback on the eve of Iceland’s National Day, 17 June 1959. A severe storm caused a temporary cofferdam at the construction site to fail, allowing large volumes of water to rush through the unfinished powerhouse and into Lake Úlfljótsvatn. Construction materials, formwork and equipment were swept away, resulting in one of the most significant incidents ever experienced during the construction of power facilities in Iceland.

Despite the damage, the response was swift. The breach was closed within a matter of days and reconstruction work began immediately. Construction remained on schedule, and Steingríms Power Station was commissioned later the same year.

Water rushing through the construction site after a temporary dam failed in 1959.
Water rushing through the construction site after a temporary dam failed in 1959.