About the Project
The work consisted of preparation of a feasibility study for 5 run-of-river hydropower projects on the Supsa river in Western Georgia, with a total capacity of about 40 MW. Two of the projects will have steel penstocks as waterways whereas the other three projects will have tunnels.
The work was done in cooperation with Verkís of Iceland and Georgian Water Project of Georgia. The client was JSC Supsa Energy of Georgia.