Information
| Installed capacity | 60 |
|---|---|
| Generating capacity | 465 |
| Carbon dioxide: (CO2) | 90-98 |
|---|---|
| Hydrogen sulphide: (H2S) | 2-10 |
| Power station | VST hf., Rafteikning hf. |
|---|---|
| Steam gathering system | Manfreð Vilhjálmsson |
| Transmission line to Akureyri and the East of Iceland designed and built by | RARIK ohf. |
| Geothermal exploration and supervision of geothermal drilling works | Orkustofnun |
| Turbines, generators and machinery | Mitsubishi Heavy Industries, Japan |
|---|---|
| Cooling towers | Marley, USA |
| Transformers | EGB, Austria |
| Low voltage power distribution | Alstom, France |
| Civil Works and Buildings | Sniðill hf. |
|---|---|
| Drilling | Jarðboranir ríkisins |
| Metal works and installation | Slippstöðin hf. |
| Installation of turbine unit 2 and expansion of steam gathering system 1996-1998 | Verkfræðistofa Guðmundar og Kristjáns hf. |
|---|---|
| Engineering Design and supervision | Verkfræðistofa Guðmundar og Kristjáns hf. |
| Drilling | Jarðboranir hf. |
|---|---|
| Mechanical equipment | Mitsubishi Heavy Industries, Alstom |
| Electrical and control equipment | Lögstrup |
| Installation of mechanical equipment and grounding | Vélsmiðjan Gils |
| Installation of electric equipment | Ljósgjafinn |








