Khrami Cascade

HydropowerSouthern Georgia

Our role: Feasibility study

About the Project

The work consisted of preparation of a feasibility study for 4 run-of-river hydropower projects on the Khrami river in Southern Georgia, with a total capacity of about 40 MW. Three of the projects have steel penstocks as waterways whereas the fourth project will have tunnels.

The work was done in cooperation with Verkís of Iceland and Hydrotechnic LLC of Georgia. The client was Khrami Cascade LLC of Georgia.